Water Storage Capacity Expansion Project

Painted Desert Demonstration Projects (PDDP), which manages the STAR School, an off-grid public charter school, and the PDDP food hub, is seeking qualified construction services for the installation of an elevated water storage tank and the repurposing of the existing water storage tanks for fire protection water storage. PDDP operates a bulk water loading station and recently installed a makerspace and farmers market building. They are currently upgrading their capacity to run the site on solar power. PDDP, through Apex Applied Technology (AATech, Manager), contracted Riley Engineering (Engineer) to design the elevated water storage tank and associated site improvements. Accordingly, the Owner/Manager is seeking bids from qualified tank and underground utility contractors (Bidders) to install and construct the new elevated water storage tank and associated piping and appurtenances and reconnect the existing water storage tanks for fire protection storage.
The Work consists of furnishing all labor, materials, and equipment necessary for installing a new elevated water storage tank; installing water pipe, valve vault, and associated appurtenances; connecting to existing piping; and reconfiguring the connections of the existing tanks to the water system such that they can be used for fire protection (service to fire hydrant on site). The Project will benefit the hundreds of families that rely on the bulk water loading station at PDDP to meet part or all of their household water hauling needs.
bids are due on April 30, 2026 at 5:00 pm (MST)
Trouble accessing the files? Email Robin at robin.al-haddad@aatechsolar.com to request the documents
Pre-bid meeting will be held on April 3, 2026 at 10:00 AM (MST) at the site location, 19722 Leupp Road, with site walk-through afterwards
Here are the EJCDC Bid Documents for the project.
Continued
Additional documents that will help interested contractors develop their proposals for the Solar Generation Facility.
Plans for the solar array.
Required forms for interested contractors.